Generic filters
Search in excerpt
Generic filters
Search in excerpt

M5 West Connex – Stage 2

CLIENT Acciona Construction Australia, Samsung C&T and Bouygues Construction Australia (ASBJV)
LOCATION Sydney, NSW
SECTOR Transport
DIVISIONS ARA Mechanical

A vital part of the tunnel’s functionality.

The West Connex project is one of Australia’s largest road infrastructure projects, aimed at relieving congestion on Sydney’s existing M5 East corridor, and improving connectivity from the M5 corridor to the Sydney Gateway precinct comprising Sydney Airport, Port Botany and southern Sydney.

ARA Mechanical was engaged by the New South Wales Government to design and install air conditioning systems in the electrical rooms and within the underground tunnel, including ventilation structures located at the exit of each tunnel to remove air from inside.

“ARA Mechanical was successful in supplying and installing best-practice MVAC systems to enable tunnel functionality, with no delays to project timelines.”

– Michael Esa, Project Engineer – Tunnel Construction